DEFENCE, PITT STREET

PROJECT DETAILS

LCS were engaged by SHAPE Australia to perform the electrical and structured cabling installation for the Defence Force Plaza upgrade. The project was a 25 floor fit-out over 1.5 years as an upgrade to the Defence building in Pitt Street, Sydney CBD.

The project included:

 
• General power outlets & UPS upgrade
• Krone Category 6 structured cabling system
• Fibre installation to workstations
• Single point emergency & exit lighting system
• Upgrading to existing base building lighting and control system
• Upgrade existing distribution boards to RCD protection

CLIENT
SHAPE Australia

SIZE
25,250m2

PROGRAMME
80 weeks

DELIVERY
Lump Sum

The LCS scope of works were carried out and coordinated with numerous ADF departments and required adherence to specific protocols and security clearances. Their commitment to WHS and quality was exceptional; so much so that examples of innovations and quality were documented and used to further train both SHAPE staff and other contractors. I would highly recommend LCS to any organisation who requires a safe, well managed, reliable and friendly contractor on their team.

James Pike Senior Project Manager